Q1.Are you a trading company or a manufacturer?
We have our own factories and companies in Shenyang and Tianjin, and we are approaching to be a top-level mechanical supplying group company.
Q2.How about the lead time?
Mold manufacturing: 3-5 weeks
Mass production: 3-4 weeks
Q3.What kind of production service do you provide?
Molds making, die casting manufacturing, investment casting manufacturing, CNC centers machining, stamping, rubber & plastic injection and kinds of surface treatment.
Q4.How long can I get any samples?
2-4 weeks according to the part’s drawing design.
Q5. How about your certificates and quality control?
- We have ISO9001:2015, ISO14001:2015 and ISO45001-2018 certificates.
- We design and make molds in-house.
- We make 100% inspecting the products before shipments.
- Transactions can be through Cooig's trade assurance.
Q6.What is your MOQ?
According to drawings design, we accept 1 piece trial order.
Q7.What is your payment terms?
For mold, 50% deposit, and 50% balance based on samples approval.
For mass production, 30%-50% deposit, and the balance before shipment.